HTS Logo
HTS Logo
Showroom
DIY
Become a Partner
Regions
Reviews
Contact
Showroom
DIY
Become a Partner
Regions
Reviews
Contact
HTS Holz-Treppen-Stufen

HTS Panknin

Westfalenstraße 6, 58455 Witten

Phone: +49 2302 888485

info@holz-treppen-stufen.de

Products

  • Stairs
  • Stair Treads
  • Showroom

Guides

  • Guides
  • DIY
  • Stair Glossary
  • FAQ
  • Our Story

Service

  • Contact
  • Showroom
  • Regions
  • Reviews
  • Partnership

Legal

  • Terms & Conditions
  • Legal Notice
  • Privacy Policy
  • Data Deletion

© 2026 HTS Panknin. All rights reserved.

  1. Home
  2. /Faq
  3. /What preparatory wo…

What preparatory work is needed before the survey?

Clear, concise answers.

For us at HTS Panknin to obtain exact measurements during the survey, the following preparatory work should be completed:

Finished surfaces: - Screed must be laid and dried - Walls in the staircase area must be plastered - Floor coverings should be confirmed or already laid

Clear access: - Old staircases and temporary scaffolding must be removed - The deck opening must be accessible from above

Free of services: - In the area of the stair stringers and bearing points, no heating pipes, electrical cables, or service ducts may be installed

Have ready for the appointment: - Preferences for wood species, railing design, and finish - Desired delivery date - Information about wall construction (load-bearing or non-load-bearing)

The more complete the preparatory work, the more precise the survey and the subsequent quote.