HTS Logo
HTS Logo
DIY
Become a Partner
Regions
Contact
DIY
Become a Partner
Regions
Contact
HTS Holz-Treppen-Stufen

HTS Panknin

Westfalenstraße 6, 58455 Witten

Phone: +49 2302 888485

info@holz-treppen-stufen.de

Products

  • Stairs
  • Stair Treads
  • Showroom

Guides

  • Guides
  • DIY
  • Stair Glossary
  • FAQ
  • Our Story

Service

  • Contact
  • Showroom
  • Regions
  • Partnership

Legal

  • Legal Notice
  • Privacy Policy
  • Data Deletion

© 2026 HTS Panknin. All rights reserved.

  1. Home
  2. /Stair glossary
  3. /Top Newel Post

Top Newel Post — Edge-guard fitting

Category: Edge-guard fitting

Upper railing post — also called the landing post — at the head of the staircase; connects handrail to landing.

The top newel post is the final post of a stair railing at the upper end of the flight. It forms the termination of the railing structure and is the counterpart to the bottom newel post. At the exit side, the railing must be designed to ensure a safe transition into the storey area.

Related terms

Related terms: Bottom Newel Post, Railing, Railing Height, Stringer Tie Rod, Handrail, Stringers.

Continue reading

  • Stair tread replacement and renovation →

    Concrete cladding, metal renovation, and individual tread replacement.

  • Custom solid wood staircases →

    Everything on construction types, materials, surfaces, and process on one page.

← Back to overview